Concentrator de-bottlenecking
Hydrocyclone re-engineering and slurry distribution redesign. ANSYS CFD model validated against plant trial. Implemented with zero unplanned downtime.
Hydrocyclone re-engineering and slurry distribution redesign. ANSYS CFD model validated against plant trial. Implemented with zero unplanned downtime.
Pilot-scale 100 kW continuous microwave applicator for kimberlite pre-conditioning. Multiphysics design, fabrication oversight, performance monitoring.
Brownfield medium-voltage upgrade across an active smelter. Protection grading, harmonic study, phased switching plan, commissioning supervision.
Front-end engineering and lab programme for a tailings re-treatment plant. Recovery model, mass balance, capex estimate to AACE Class 3.